The steel structure for the roof is in place
Wednesday, 19. April 2023 | SAP Garden: steel structure for the roof is in place
The steel structure for the roof is in place// NEWSThe crowning glory of an elaborate construction. In mid-April, the last of the 18 bolted trusses was assembled by Unger Steel.
The bowl, including the peripheral areas and terrace, was spanned with a steel construction weighing around 3,000 tons and covering a floor area of 13,960 m².
The longest truss measures approx. 87 metres and weighs 120 tons. The shortest has a length of 34 metres and a weight of 50 tons.
Die Stahlkonstruktion für das Dach steht
// AKTUELLES
Mit Video
Glas facade closed// NEWS
Production of the exterior facade// NEWS
Mit Video
Innovative grandstand system for the SAP Garden// NEWS
Mit Video
Glas facade closed// NEWS
Production of the exterior facade// NEWS
Mit Video
Innovative grandstand system for the SAP Garden// NEWS
Always be informed!
Yes! I would like to receive ongoing information about events, products, activities and offers from SAP Garden and Red Bull Stadion München GmbH by email. I know that I can revoke this consent at any time free of charge by clicking the “Unsubscribe“ button or by sending an email to service@sapgarden.com. Information about what personal data we collect about you and how we process it can be found in our data protection declaration.
example@example.com
SAP